Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Concrete Driveways & Concrete Work in Fullerton, CA: What It Costs and How Long It Takes
Concrete driveways and concrete work in Fullerton run $4,500 – $12,000 for a new driveway pour and $5,000 – $14,000 when the old slab has to be torn out and replaced. A tear-out and repour typically takes 3 – 5 working days on site, and the concrete then needs 5 – 7 days of curing before you drive on it. Call (888) 300-3178 for a free on-site estimate. We walk the slab, measure, and put the number in writing before anything gets demoed.

How We Pour a Driveway in Fullerton, Stage by Stage

Every concrete job we run in Fullerton follows the same sequence. The steps don’t change, but the duration does, depending on how much demolition, grading and rebar work your site needs.
Stage 1: Walk and layout (day 1)
We measure the driveway footprint, check the grade against the garage slab and the street apron, and mark expansion joints and control joints. You decide the slope and the finish at this point, not later. If your driveway ties into a curb, we confirm the driveway approach dimensions before we cut anything.
Stage 2: Demo and haul-off (day 1 – 2)
Old concrete comes out with a breaker, and we haul the rubble off the same day or the next. On Fullerton lots with a block wall along the property line, we protect the footing and work carefully around it. If there’s root intrusion from a mature ficus or eucalyptus, we grind the roots back and note it, because a root that keeps pushing will crack a new pour just as fast as the old one.
Stage 3: Grading and base prep (day 2 – 3)
We excavate to the depth the pour needs, compact the native soil, and lay a compacted aggregate base. Then come the forms, the rebar grid (or fiber mesh, depending on the mix and spec), and the vapor barrier under the slab. This is the stage that determines whether your concrete lasts. Rushed base prep is the most common reason a driveway fails early.
Stage 4: Pour and finish (day 3 – 4)
The concrete truck arrives, we pour in sections, and the crew screeds, floats, and finishes the surface. Most Fullerton homeowners choose a broom finish for traction on the slope. Exposure, salt finish and saw-cut patterns are available if you want a cleaner look. Control joints go in while the concrete is still workable.
Stage 5: Cure and cleanup (day 4 – 7)
We manage the cure: keeping the slab moist in the first 24 hours, especially through hot inland afternoons. You’ll wait 5 – 7 days before driving on it and up to 28 days for full design strength. We clean up and walk the finished work with you before we call the job complete.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Concrete Options You’ll Choose Between
Most of the decisions on a driveway job happen before the truck shows up. Here’s what actually matters, with the trade-offs spelled out.
- Standard gray concrete vs. colored or decorative mix. Standard gray is the lower-cost route and holds up well. Integral color or a stamped or exposed aggregate finish adds surface texture and looks, at a premium of roughly $2 – $5 per square foot over plain concrete.
- Rebar vs. fiber mesh. Rebar adds structural reinforcement for driveways, which matters on Fullerton’s older 1950s slabs where the base may be uneven. Fiber mesh is cheaper and works on lighter loads. We’ll recommend one based on your site, not a sales pitch.
- Thickness. 4 inches is the residential standard. 5 – 6 inches costs more but makes sense where a heavier vehicle or a slope change is involved.
- Finish and texture. A broom finish is the workhorse: good grip, modest cost. Saw-cut joints give a cleaner look. Exposed aggregate is durable but harder to shovel and sweep.
- Joint layout. Control joints need to land at the right spacing or the slab cracks where you didn’t plan. This is a spec decision, not a cosmetic one.
- Drainage and curb ties. Where your driveway meets the street matters for runoff. Fullerton lots on graded streets need the apron tie handled correctly to avoid pooling.
What Concrete Driveways & Concrete Work Costs in Fullerton, CA
A new concrete driveway in Fullerton is typically $4,500 – $12,000. A full driveway replacement, where we demo the old slab and pour fresh, runs $5,000 – $14,000. Here’s what moves you toward the low end and what pushes you toward the high end:

- Square footage. A single-car drive is at the low end; a wide double or a circular drive pushes the number up.
- Demo and haul-off. If the old slab is thick, reinforced, or set deep, removal costs more. Clean soil is faster and cheaper than a site with roots and rubble.
- Base and grading. Uneven lots that need excavation and imported base add cost. So does a driveway that has to be re-graded to shed water correctly.
- Material grade and finish. Standard gray with a broom finish sits at the low end. Color, stamping, and exposed aggregate sit at the high end.
- Permits and curb ties. Any work in the public right-of-way, or a new driveway approach, calls for a permit from Fullerton, which is a real line item.
A written estimate from us lists each stage: demolition, haul-off, base prep, reinforcement, pour, finish, and disposal. What typically isn’t included: repairs to a cracked or undermined garage slab, drainage corrections, and any root removal beyond the immediate pour line. We spell those out so the number you see is the number you pay.
See the difference
Before
After
Before
After
Before
AfterWhat Fullerton Homes Do to a Concrete Job
Downtown and the older blocks (92832 and 92836) hold 1910s – 1940s Craftsman and Spanish Colonial bungalows with balloon-frame construction and original single-pane windows. Near those homes, a driveway pour often comes with a short, narrow apron and a tight property line, so the crew works in a smaller footprint. On the 1950s – 1970s stucco-clad ranch homes in 92831, 92833 and 92835, we more often see shallow slabs and undersized footings, which means we may find soft or uneven base under an old driveway and have to correct it before pouring. Blocks near the downtown Fullerton historic core can fall under older preservation-conscious review, so we check that early rather than late. Cal State Fullerton’s campus drives steady rental-rehab work around the neighborhoods nearby, and that work also means driveways that get used hard. We cover all of Fullerton, from 92836 through 92833 and 92835. If your project grows beyond the driveway, homeowners often pair this with Door Installation in Fullerton or a wider Driveway & Pavers in Fullerton scope.
Serving Fullerton, CA – Our Local Coverage Area
We serve Fullerton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Concrete Driveways & Concrete Work in Fullerton

A standard tear-out and repour in Fullerton takes 3 – 5 working days on site, plus 5 – 7 days of curing before you drive on the new slab. Larger jobs with heavy demolition or grading can run longer. Call (888) 300-3178 and we’ll give you a timeline for your specific property.
New driveway approaches that tie into the public right-of-way generally require a permit, and any work near the curb should be confirmed with the city before we pour. We handle the permit question during the estimate so there are no surprises. Call (888) 300-3178 to schedule that walk-through.
No. Our written estimates are fixed-price, and we list what’s included up front. If we find something under the slab that genuinely changes scope, we stop and get your approval before we touch it. Call (888) 300-3178 to request a free estimate.
Sometimes, if the existing slab is sound and the grade allows for a proper base and thickness over it, a pour-over is possible. But most Fullerton slabs we see are cracked or undermined enough that replacement is the better long-term call. We’ll tell you honestly which one your site needs. Call (888) 300-3178 for an on-site assessment.
Our concrete work is backed by the 730-Day Done Right Promise: if it’s not done right, we make it right. That’s one of the longest workmanship guarantees in residential construction. Call (888) 300-3178 to talk through the coverage on your job.
If the driveway is part of a larger build-out, our Driveway & Pavers service covers the full scope, and for accessory structures, homeowners often pair this with ADU Site Prep & Utilities in Fullerton. See our Fullerton service area for everything we do here.
Get a Free Estimate on Concrete Driveways & Concrete Work in Fullerton
Call (888) 300-3178 to schedule a free on-site estimate for concrete driveways and concrete work in Fullerton. A live person answers, day or night. We’ll measure the site, walk the grading and base with you, and hand you a written, line-item estimate with fixed pricing and no change orders. Financing is available at 0% for 18 months, and projects over $10,000 get $1,000 off.