







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Stanton, CA: What the Job Actually Involves
New cabinets and countertops in Stanton typically run $14,000 – $45,000 for a full kitchen’s worth of cabinetry and a stone or solid-surface top, with most projects finished in three to five weeks from demo to final caulk. The work replaces your cabinet boxes and doors, your countertop slab, and usually the sink and hardware, while leaving plumbing and electrical in place unless the layout changes. Call (888) 300-3178 for a free on-site estimate and a written line-item quote before you commit to anything.

How the Job Runs, Day by Day

Cabinet and countertop work has a rhythm to it. Here’s the sequence we follow, and what you’ll be deciding at each point.
Stage 1: Template and confirm (week before demo)
We measure the existing run, check wall plumb and floor level, and confirm the cabinet order and slab selection. This is where you lock in door style, finish, and countertop material. If your Stanton home has out-of-square walls from its 1950s or 60s framing, we note the scribe and filler plan now rather than discovering it on install day. Two to three hours on site.
Stage 2: Demo and prep (day 1 – 2)
Old cabinets come out, the sink gets disconnected, and we inspect what’s behind them: galvanized supply lines, aged drywall, sometimes old mastic. Any framing or plumbing surprises get photographed and priced before we proceed. Half a day to two days depending on how much is coming out.
Stage 3: Cabinet install (day 3 – 5)
Base cabinets set first, then uppers, then leveling, shimming, and door and drawer alignment. You’ll pick hardware placement and confirm appliance openings during this window. Three to four working days for a standard kitchen.
Stage 4: Countertop template and install (day 6 – 12)
Stone and quartz get templated after cabinets are set, then cut and installed. That gap is normal, not a delay. Sink and faucet cutouts happen at fabrication. Install is one day, usually with a two-day wait before the sink and dishwasher get hooked back up.
Stage 5: Final trim and walkthrough (day 13 – 15)
Toe kicks, end panels, caulk lines, and a full function check on every drawer and door. You walk the job with us, we address anything on the punch list, and the 730-Day Done Right Promise goes active from that day forward.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Cabinet and Countertop Options You’ll Weigh
Most of the decisions on this job come down to four choices. Here’s the honest trade-off on each.
- Cabinet construction: Plywood boxes with solid wood or MDF doors hold up best in a humid coastal kitchen. Particleboard boxes cost less but swell if a supply line ever drips. KraftMaid is a solid middle-to-upper path for stocked and semi-custom sizing.
- Door finish: Painted MDF takes a smooth finish and reads clean; thermofoil is cheaper but can peel at edges near the dishwasher. Stained wood shows wear more gracefully but costs more.
- Countertop material: Quartz is the practical default now: non-porous, no sealing, and Cambria’s line is what most Stanton buyers land on. Granite costs about the same but needs sealing every year or two. Laminate runs a fraction of the price and is a fair choice for a rental or a flip.
- Sink and edge profile: An undermount sink with a standard eased edge keeps cost down. Farmhouse sinks and thick mitered edges add labor and slab waste, and both push the countertop line toward the top of its range.
What Cabinets & Countertops Cost in Stanton, CA
Cabinet installation in Stanton runs $4,000 – $13,000, and countertop installation runs $2,000 – $6,500. Together with demo, disposal, and trim, most full kitchens land in the $14,000 – $45,000 range, with the low end on stock cabinets and laminate and the high end on semi-custom cabinetry with quartz.

Four things move that number:
- Linear footage and layout: a galley under 15 feet stays near the floor; an L-shape with an island and pantry pushes toward the ceiling.
- Material grade: stock versus semi-custom cabinetry can swing the cabinet line by thousands on its own.
- Existing condition: old galvanized plumbing, out-of-level floors, or undersized framing behind the wall add repair scope that isn’t in the base bid.
- Layout changes: moving the sink or range means new plumbing and electrical, and that’s where permits and inspection enter the picture.
A written estimate from us lists cabinets, slab, fabrication, demo, disposal, and labor as separate lines, so you can see what a change would actually cost. What’s typically not included: appliance purchase, backsplash tile (that’s Kitchen Remodeling in Stanton scope), and any structural work discovered after demo.
See the difference
Before
After
Before
After
Before
AfterWhat Stanton Homes Specifically Do to This Job
Stanton is 3.8 square miles, almost fully built out, and nearly every kitchen we open up sits inside a 1950s or 60s single-story stucco tract house on a small lot. That build era shows up in predictable places: cabinet runs that are slightly out of square, undersized or rough-sawn framing behind the wall, and original galvanized supply lines that are often one thin spot away from a leak. We plan for scribe and filler on nearly every Stanton install because the walls rarely cooperate. The city’s small plan-check desk means a like-for-like cabinet swap usually moves without a permit, but relocating plumbing or adding electrical does pull one, and we handle that filing. Because lots are tight and mature street trees line most blocks, we stage from the driveway and keep demo debris moving out the same day it comes down. If your project expands past cabinets into a larger structural change, our kitchen remodeling service covers the full scope, and homeowners often pair this with Garage Conversion ADU in Stanton work when the old garage is part of the plan. We cover all of Stanton, and the same crew handles New Detached ADU in Stanton builds when a family is adding space rather than reworking the kitchen.
Serving Stanton, CA – Our Local Coverage Area
We serve Stanton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked: Cabinets & Countertops in Stanton

Expect $14,000 – $45,000 for a full kitchen’s cabinets and countertops, with the swing driven by cabinetry grade, slab material, and whether the layout moves. Call (888) 300-3178 for an exact quote. Estimates are free.
Not for a like-for-like replacement of the same footprint. A permit is required once you relocate plumbing, add electrical, or change structure, and we pull that permit and pass the inspection for you.
Three to five weeks for most jobs. Cabinets go in during the first week, the countertop template and install add several days of wait, and final trim wraps the job. You’ll have a working sink again by the end of week two or three.
Often, yes, if the boxes are solid and level. We check drawer boxes, hinges, and carcass integrity during the estimate and tell you honestly whether a new top makes sense over the old cabinets or whether you’d be throwing money at a box that’s near the end of its life.
Every cabinets and countertops job is covered by our 730-Day Done Right Promise. If something isn’t right, we come back and make it right, and the manufacturer’s warranty on cabinetry and slab applies on top of that.
Get a Free Cabinet and Countertop Estimate in Stanton
We’ll come out, measure the space, review your cabinet and slab options, and hand you a written line-item estimate with no pressure and no surprises. Calls are answered by a live person, and our technicians are background-checked and arrive in uniform. Call (888) 300-3178 to schedule your free estimate for Cabinets & Countertops in Stanton, CA. $1,000 off on projects over $10,000, and 0% financing for 18 months is available.
Written by the team at Groundwork Construction Co. of Anaheim.












