Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in La Habra: What the Job Actually Costs and How Long It Takes
New cabinets and countertops in La Habra typically run $14,000 to $45,000 for a full kitchen, with the cabinets alone at $4,000 to $13,000 and the countertop at $2,000 to $6,500. The work itself usually takes two to four weeks from demo to final caulk, and you’ll be without a usable counter for about a week of that. Call (888) 300-3178 and we’ll walk your kitchen and put a written, line-item number in front of you.

How We Run a Cabinet and Countertop Job, Stage by Stage

A cabinet and countertop job is really a sequencing problem. Get the order wrong and you’re paying twice. Here’s the actual order we work in, and where you have to make a decision.
Stage 1: Measure and template (day 1, about 2 hours)
We take field measurements of every wall, check for out-of-square corners, and note where the electrical and plumbing land relative to the new cabinet boxes. You decide the door style and finish at this stage, because that’s what drives the lead time. Most semi-custom lines run three to five weeks out of the factory.
Stage 2: Demo and prep (days 2 to 3)
Old cabinets come out, we pull the old countertop, and the wall gets patched and brought to flat. If the existing drywall behind the cabinets is crumbling or the wall is out of plumb by more than an inch, we address it now rather than shim around it. You decide whether to add an outlet or move a gas line while the wall is open. Doing it later costs three times as much.
Stage 3: Cabinet install (days 4 to 6)
Base cabinets go in first and get shimmed level and screwed to the studs, then uppers, then the boxes get squared and the doors and drawers hung and adjusted. This is also when the cabinet crown and any filler panels get fitted. You’ll want to be around on the last day of this stage to walk the reveal lines.
Stage 4: Template and fabricate the countertop (days 7 to 14)
For stone or quartz, a fabricator comes out with a physical template after the cabinets are set, then cuts the slab at the shop. That’s a five to seven day gap where your kitchen is functional-ish but not finished. Laminate and butcher block get cut on site and go in the same week.
Stage 5: Sink set, countertop install, hookup (days 15 to 20)
The countertop goes down, the sink and faucet get set and sealed, the dishwasher gets reconnected, and we run a leak check on the supply and drain. You decide the sink style before stage 4, not during. Undermount sinks have to be at the fabricator when the slab is cut.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Options You’ll Choose Between (and What Each One Costs You)
- Stock versus semi-custom cabinets. Stock boxes are cheap and fast but come in fixed widths, so you fill gaps with filler strips that look like filler strips. Semi-custom gives you real widths in 3-inch increments and better drawer hardware. Budget roughly 30 to 40 percent more for semi-custom. KraftMaid is the line we spec most for La Habra homes because it hits the middle of that range without the plywood-box upgrade cost.
- Quartz versus granite versus laminate for the countertop. Quartz is non-porous, doesn’t need sealing, and holds up to the hard water we get here. Granite is natural stone, needs resealing roughly once a year, and every slab is different. Laminate is the budget answer at a fraction of the cost and looks fine for a decade if the edge profile is done right.
- Full-overlay versus inset doors. Full overlay is standard, cheaper, and forgiving. Inset doors sit flush inside the frame and look beautiful in a period home but demand a level, square cabinet box, and any wall out of plumb shows up. Expect a meaningful premium and a longer install.
- Undermount versus drop-in sink. Undermount looks cleaner and makes wiping the counter into the sink easy. Drop-in is cheaper to install and easy to swap later. Undermount requires the sink on site before the slab is cut.
- Refacing the existing boxes versus new cabinets. If the boxes are solid 1970s plywood, refacing the doors and drawers is real money saved. If the boxes are particleboard that’s swollen from a past leak, refacing is throwing good money after bad.
What Cabinets & Countertops Costs in La Habra, CA
Expect $14,000 to $45,000 for a full kitchen’s worth of cabinets and countertops. Here’s how that range breaks down, and the four things that push a job from one end to the other.
| Line item | La Habra range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash (basic tile) | $800 – $2,500 |
| Kitchen island install | $3,000 – $10,000 |
Size of the run. A galley kitchen with 12 linear feet of cabinet is a fundamentally cheaper job than a U-shaped kitchen with 30 feet, an island, and a peninsula. Material cost scales almost linearly with footage.
Condition of what’s behind the wall. Most La Habra kitchens from the 1950s to 1970s have original galvanized supply lines and two-prong outlets at the counter. If we open a wall and find a corroded riser, that’s a plumbing repair before your countertop ever arrives.
Material grade. Painted MDF doors and a laminate top land near the bottom of the range. Natural wood doors, a quartz slab with a waterfall edge, and an island bring it to the top.

Whether we’re moving plumbing or electrical. Relocating a sink or adding a dishwasher circuit means permits, an inspection, and a trade coming out. That’s a discrete line on the estimate, not a surprise.
Every written estimate we hand you is line-itemed, and the number on it is the number you pay. 0% financing for 18 months is available if the timing helps, and projects over $10,000 get $1,000 off.
See the difference
Before
After
Before
After
Before
AfterWhat La Habra Homes Specifically Do to This Job
La Habra is almost fully built out, so nearly every job here is a remodel inside an existing footprint rather than new construction, and that shows up in the cabinets and countertops work directly. The housing stock runs mostly 1950s to 1970s single-story stucco, and when we pull old cabinets out we regularly find galvanized plumbing and clay sewer laterals that were never upgraded, plus electrical panels from an era that predates dishwashers and disposals. That doesn’t kill a cabinet job, but it’s a real budget line, and we check for it before we quote, not after demo.
The bigger issue in this city is walls that have moved. In the foothill edges toward the Puente Hills, we see homes built on expansive soils where the dry summer and the rainy season move the slab and the drywall above it. Cabinets that hung straight in 1968 may be sitting against a wall that’s out of plumb by an inch and a half, and shimming around that is how you get a countertop with a visible gap at the backsplash. We measure wall flatness during stage 1 so we know whether we’re floating cabinets out or correcting the wall. The Planning Division here works in remodel mode, so a cabinet swap that doesn’t move plumbing or structure typically doesn’t need a permit, but anything that does is inspected. If you’re planning to expand the footprint while you’re at it, cabinets and countertops usually go in as part of a Kitchen Remodeling in La Habra scope, and we handle both under one contract.
Serving La Habra, CA – Our Local Coverage Area
We serve La Habra and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in La Habra

Plan on two to four weeks of active work, and roughly six to nine weeks of total calendar time once you count factory lead time on semi-custom cabinets. The countertop template gap alone is five to seven days. Call (888) 300-3178 and we’ll give you a real schedule off your kitchen’s footage.
Usually no, as long as you keep the plumbing and electrical where they are. A straight swap of cabinet boxes and countertop over the same sink location typically doesn’t trigger a permit. Move the sink, add a circuit for a disposal, or open a wall, and it does. We pull the permits and pass the inspections when the job calls for them.
Yes, and it’s the most common version of the job. If the sink stays put and the range stays put, we swap cabinets and countertops in the same footprint, which cuts cost and time. Most La Habra kitchens we do are exactly this.
A partial kitchen scope, like a single cabinet run plus countertop, lands in the $9,000 to $20,000 band. Cabinet-only work runs $4,000 to $13,000. Call (888) 300-3178 for an exact quote, and the estimate is free.
Our workmanship is covered by the 730-Day Done Right Promise: if it isn’t done right, we make it right. Cabinet and countertop product warranties come from the manufacturers, and we’ll hand you the paperwork at the walkthrough.
Get a Written Cabinet and Countertop Estimate in La Habra
We’ll come measure your kitchen, look behind the old cabinets, and hand you a line-itemed number for cabinets and countertops in La Habra, with no change orders hiding in it. Call (888) 300-3178 and a live person picks up, any hour. We’ll schedule a free on-site estimate, talk through door styles and countertop materials, and tell you honestly whether refacing makes more sense than replacement. Our Kitchen Remodeling service covers the wider scope if your project grows, and we work across La Habra including the hillside streets near the Puente Hills. If storage is the reason you’re remodeling at all, homeowners often pair this with a Garage Conversion ADU in La Habra or a New Detached ADU in La Habra.