







Free written scope consultation - allowances, timeline, and change-order rules on paper before a single trade is scheduled
Cabinets & Countertops in Fullerton, CA: What They Cost and How Long They Take
New cabinets and countertops in Fullerton, CA typically run $14,000 – $45,000 for a full kitchen’s worth of both, and the job usually takes two to four weeks from demolition to final caulk. Cabinet installation alone lands at $4,000 – $13,000; countertops at $2,000 – $6,500. The schedule hinges on one thing: whether the countertop template waits on cabinets that are already set and level. Call (888) 300-3178 and we’ll walk your kitchen and give you a written line-item number.

How the Job Actually Runs, Stage by Stage

Most contractors describe cabinets and countertops as one blurry phase. It’s really five stages, and the homeowner makes a decision at each one.
Stage 1: Measure and layout (day 1, 2 – 3 hours). We template the room, check wall plumb and floor level, and confirm appliance openings and sink centerline. This is where you lock the cabinet box sizes and the door style. A wall that’s out of plumb by half an inch changes filler sizes, so we measure before you order anything.
Stage 2: Demolition and prep (days 2 – 3). Old cabinets, countertops and backsplash come out. We cap the water lines, pull the old electrical, and patch and level the wall surface. If the range hood or sink is moving, the rough plumbing and electrical go in now, because it’s far cheaper before the boxes are hung.
Stage 3: Cabinet set (days 4 – 7). Base and wall cabinets go in, shimmed level and screwed to studs. You confirm drawer and door swing direction before we drill pulls. This is the stage that must be finished and level before anyone measures stone, because a countertemplate taken over a crooked cabinet run produces a counter that rocks.
Stage 4: Template and countertop install (days 8 – 15). The fabricator templates the installed cabinets, cuts the slab, and returns to set it. Stone lead time is the wildcard here. You choose the edge profile and the sink cutout (undermount versus drop-in) at templating, not after.
Stage 5: Backsplash, hardware, punch (days 16 – 21). Splash tile, pulls, caulk lines, and a final walkthrough. You sign off on the punch list, and the work falls under our 730-Day Done Right Promise.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The Choices You’ll Weigh Before You Order
The material grade is where most of the money sits, so pick it before you pick a color.
- Cabinet box construction: particleboard boxes are the value option and fine in dry rooms, but plywood boxes hold up better in Fullerton’s hot, dry summers and cost roughly 20 – 30% more. Framed versus frameless changes usable interior space and door alignment.
- Door material: thermofoil is the cheapest and can peel in heat; painted MDF and solid wood take moisture swings better. KraftMaid is a name worth recognizing at the mid-to-upper end.
- Countertop surface: laminate runs a few hundred dollars a section and wears; quartz (Cambria) sits mid-to-high and resists staining; granite is durable but needs sealing; butcher block is warm and needs oiling.
- Sink and faucet: an undermount sink looks clean but needs a solid stone edge; a drop-in is forgiving and cheaper to swap later.
- Hardware and pulls: a small line item that changes the whole feel, and worth deciding before the doors are drilled.
What Cabinets & Countertops Costs in Fullerton, CA
A typical Fullerton kitchen runs $14,000 – $45,000 for cabinets and countertops together. That spread is driven by five variables, not by vague “market conditions.”

- Cabinet run and box count: a galley with 12 linear feet prices far below an L-shape with an island at 25 feet. More boxes, more cost.
- Existing condition: a level, square wall keeps the price low. Out-of-plumb walls, water damage behind an old sink, or a floor that needs leveling pushes to the high end.
- Relocating plumbing or electrical: moving a sink or range means opening walls, which adds labor and a permit line. Keeping utilities in place is the single biggest cost saver.
- Material grade: stock cabinets and laminate sit at the bottom; custom boxes and quartz at the top.
- Permit scope: a straight cabinet swap usually needs no permit, but plumbing or electrical relocation does. Our estimate spells out which one your job is.
A written estimate lists cabinets, countertops, demolition, installation labor, and any rough-in work, with the number you see being the number you pay. It typically excludes appliance purchase and any structural repair found behind a wall, which we quote separately before we touch it. Call (888) 300-3178 for an exact quote – estimates are free.
See the difference
Before
After
Before
After
Before
AfterWhat Fullerton Homes Do to This Job
Fullerton’s housing stock splits the work in two. The 1910s – 1940s Craftsman and Spanish Colonial bungalows near downtown in 92832 and 92836 have plaster walls and balloon-frame construction, so cabinet mounting means finding real studs behind lath, and an original kitchen often has a shallow sink cabinet that no new box fits without a filler. Across 92833 and 92835, the 1950s – 70s stucco ranch homes sit on shallow slabs with older wiring and out-of-level floors, so a cabinet run that looks flat can hide a dip that shows up at the counter seam. We check both before we order. This is part of a Kitchen Remodeling in Fullerton scope when the job grows past cabinets, and it’s why we measure twice here.
Serving Fullerton, CA – Our Local Coverage Area
We serve Fullerton and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently Asked – Cabinets & Countertops in Fullerton

Expect two to four weeks, with stone lead time as the main variable. Cabinets are usually set within the first week, and the counter waits on the template. Call (888) 300-3178 and we’ll give you a schedule for your specific kitchen.
Usually not for a straight cabinet and counter swap, but you do when plumbing or electrical moves. We tell you which applies before we quote, and we pull the permit when one is required. Call (888) 300-3178 to find out where your job lands.
Yes, and it saves real money. Keeping the sink and range where they are avoids opening walls and skips the rough-in line on the estimate. Call (888) 300-3178 for a quote that reflects the simpler scope.
Most Fullerton jobs land between $14,000 and $45,000 depending on box count, condition, and material grade. Cabinets alone run $4,000 – $13,000 and countertops $2,000 – $6,500. Call (888) 300-3178 for an exact quote – estimates are free.
Workmanship is covered by our 730-Day Done Right Promise; if something isn’t done right, we make it right. Materials carry their own manufacturer coverage on top. Call (888) 300-3178 to talk through the details.
Get a Free Estimate for Cabinets & Countertops in Fullerton
We’ll measure your kitchen, check the walls and floor, and hand you a written line-item estimate covering cabinets, countertops, and installation, with no surprise change orders. If the job is part of a broader scope, our Kitchen Remodeling service covers the rest, and we’re proud to serve homeowners across Fullerton. Homeowners often pair this with a Garage Conversion ADU in Fullerton or a New Detached ADU in Fullerton. Call (888) 300-3178 for your free estimate.
Written by the team at Groundwork Construction Co.












