Cabinets & Countertops in Irvine, CA: What the Job Actually Costs and How Long It Takes
New cabinets and countertops in Irvine typically run $14,000 – $45,000 for a full kitchen, with cabinet installation alone at $4,000 – $13,000 and countertops at $2,000 – $6,500. The work itself takes about 3 – 5 weeks from demolition to final countertop install, but in Irvine the schedule is usually set by HOA architectural review and city plan-check, not by the trades. Call (888) 300-3178 for a free on-site estimate.

How we run a cabinet and countertop job in Irvine, stage by stage

Stage 1: Measure and layout (day 1, about 2 hours). We laser-measure the room wall to wall, check how square the corners are, and note where the shutoffs, outlets, and vent hood land. Most Irvine homes from the 1970s through the 1990s have at least one out-of-square corner in the kitchen. You decide the cabinet line and door style at this stage, because lead times drive everything after it.
Stage 2: Confirm the design review and permits (week 1 – 6, varies). This is where Irvine jobs live or die. If your changes are cosmetic – same footprint, same cabinet locations, no wall moved – most villages don’t require an architectural submittal, and the city usually treats it as a non-structural finish swap. If you’re moving a sink, adding an island, or changing a window, you’re into plan-check and possibly village architectural review. We prepare the drawings and submittal packet while you finalize materials. You decide the countertop slab and edge profile here.
Stage 3: Demo and prep (days 1 – 3 of construction, 2 – 3 days). We pull old cabinets and countertops, cap or relocate the plumbing and electrical, patch drywall, and check the subfloor for soft spots around the sink and dishwasher. If we find water damage behind the sink base, you get photos and a written change order before anyone touches it. You don’t need to be home.
Stage 4: Cabinet set and template (days 3 – 6, 3 – 4 days). Base and wall cabinets go in, shimmed level and scribed to the walls. Then the countertop fabricator comes out to template – the physical slab can’t be cut until the cabinets are set, which is why countertop day always comes after cabinet day. Sink and faucet are on site by now. You decide hardware placement before we drill.
Stage 5: Countertop install and finish (days 10 – 15, 1 – 2 days plus cure). Slab goes down, seams are set, sink and faucet connect, and the backsplash gets set if it’s part of the scope. Caulk and adhesive need 24 hours before you load the counters. Final walkthrough happens after that.
From signed contract to finished kitchen, plan on 3 – 5 weeks of construction and 2 – 6 weeks of lead time, run in parallel where we can. The sequence matters: cabinets before template, template before fabrication, fabrication before install.
Styles & brands we work with
- Kitchen remodeling
- Bathroom remodeling
- Home additions & ADU
- Roofing
- Windows & doors
- Driveway & pavers
- Fence
The choices that actually change the outcome
- Stock vs. semi-custom cabinets. Stock lines ship in 1 – 3 weeks and keep the budget down. Semi-custom (KraftMaid is the line we install most) adds 4 – 8 weeks of lead time but lets you fit odd wall runs and non-standard depths, which matters in the angled kitchens common in older Woodbridge tracts.
- Plywood vs. particleboard boxes. Plywood holds up better under a sink and in Irvine’s dry indoor air. Particleboard is cheaper and fine for uppers. Ask which one you’re getting – it’s rarely spelled out in a bid.
- Quartz vs. granite vs. quartzite. Quartz is non-porous and needs no sealing, which suits a household that doesn’t want maintenance. Granite is natural stone, needs resealing every year or two, and no two slabs match. Quartzite is the hardest of the three, but it’s priced accordingly and can stain if left wet.
- Slab thickness and edge. 3cm is standard. A built-up edge or waterfall end adds fabrication cost. A plain eased edge is the lowest-cost finish and looks clean in a modern kitchen.
- Door style and finish. Painted shaker is the safe pick. Flat slab doors look sharp but show every fingerprint. A full-overlay vs. inset decision changes the cabinet cost by a meaningful margin.
What cabinets and countertops cost in Irvine, CA
A full kitchen cabinet and countertop replacement in Irvine runs $14,000 – $45,000. Line by line:
| Item | Typical Irvine range |
|---|---|
| Cabinet installation | $4,000 – $13,000 |
| Countertop installation | $2,000 – $6,500 |
| Backsplash (if included) | $800 – $2,500 |
| Island (if included) | $3,000 – $10,000 |
Five things push a job toward the high end: kitchen size and cabinet count, whether the layout moves (which means new plumbing and electrical), cabinet grade and door style, countertop material and slab size, and permit scope. In Irvine the permit variable is bigger than most homeowners expect. A cosmetic swap that stays inside the existing footprint often needs no city permit at all. A layout change with a moved sink or a new island usually does, and that drags the schedule out.
A written estimate from us lists cabinets, countertops, labor, disposal, and any permit fees as separate lines. It generally does not include appliance costs, structural changes if a wall turns out to be load-bearing, or unforeseen water damage behind the sink. Those get a change order with photos before work continues – no surprise line items on the final invoice.

See the difference
Before
After
Before
After
Before
AfterWhat Irvine homes specifically do to this job
Irvine is a master-planned city, built essentially from the 1970s onward by the Irvine Company, and that shape shows up in every cabinet job we touch. Nearly every home sits inside an HOA-governed village with architectural guidelines, from the 1970s tracts in Woodbridge and Deerfield through the 1990s – 2000s villages like Northwood, Westpark, and Woodbury, plus the dense attached townhomes in the Spectrum and Great Park areas. Interior cabinet work is usually yours to control – but the moment a job touches a window, an exterior wall, or a vent, the village architectural committee and city plan-check get involved, and a homeowner can lose weeks to a color or setback detail a Santa Ana contractor never has to think about. We handle the submittal packet as part of the job.
The housing stock matters too. In the older Woodbridge and Deerfield kitchens we regularly find dropped ceilings over the cabinets, soffits hiding ductwork, and out-of-square walls that need scribe molding instead of a straight run. In the attached Spectrum and Great Park townhomes we’re working against shared party walls and tight plumbing chases, which limits how far a sink can move. If your project reaches beyond the cabinets – new layout, new appliances, a deeper scope – that’s a Kitchen Remodeling in Irvine conversation, and we scope it that way from the start rather than bolting it on mid-job. Our Kitchen Remodeling service is the broader umbrella; this page is the cabinet and countertop piece of it. We cover all of Irvine, including ZIP codes 92623, 92710, 92606, and 92614.
Serving Irvine, CA – Our Local Coverage Area
We serve Irvine and nearby communities. Use the map below to see the area we cover. If you’re nearby, we can almost certainly help.
Frequently asked – cabinets and countertops in Irvine

Plan on 3 – 5 weeks of construction. Cabinet lead time runs 1 – 3 weeks for stock and 4 – 8 weeks for semi-custom, and countertop fabrication adds 5 – 10 business days after templating. On an Irvine job with no HOA or permit requirement, that’s the whole timeline. Call (888) 300-3178 for a schedule tied to your specific kitchen.
Usually not if you’re replacing cabinets and counters in the same footprint with no plumbing, electrical, or structural changes. Moving a sink, adding an island, or changing a window typically triggers both city plan-check and village architectural review. We tell you which category you’re in before you sign, and schedule a free estimate to confirm it.
Yes, and most Irvine homeowners do exactly that. Keeping the sink, dishwasher, and range where they are avoids plumbing and electrical relocation and keeps the job in the $4,000 – $13,000 cabinet range. A layout change is what pushes the project toward the top of the price band.
Most full kitchens land between $14,000 and $45,000, with cabinets at $4,000 – $13,000 and countertops at $2,000 – $6,500 as stand-alone items. Size, cabinet grade, countertop material, and permit scope are the main drivers. Call (888) 300-3178 for an exact quote – estimates are free.
Every cabinet and countertop job we do is backed by our 730-Day Done Right Promise, one of the longest workmanship guarantees in residential construction – if it’s not done right, we make it right. Calls are answered by a live person 24/7, and you’ll see no-hassle upfront pricing with no surprise line items.
Get a free on-site estimate
If you’re planning cabinets and countertops in Irvine, call (888) 300-3178. We’ll set a time to walk your kitchen, measure the room, and talk through cabinet lines, countertop materials, and whether your plans need HOA or city sign-off. You’ll get a written, line-item estimate – no guessing, no pressure. If the scope grows into a full rebuild, we can fold it into a renovation that keeps everything under one contractor from foundation to finish line.